The following is a list of open permit applications for notices of construction received by the Southest Clean Air Agency. Facilities include:

Chiltworth Pacific Fire Laboratories, Inc. CO-844
Chinook Ventures, Inc. - Flat Storage CO-845
Pacific Rock Products, LLC CL-1815
Chehalis Lam, Inc. L-625
WaferTech CL-1901
United Harvest, LLC CO-889
Kalama Export CO-891
Old Friends Custom Finishing CL-1908
Vantage Technology Inc. CL-1909
Hampton Lumber Mills – Randle Facility Title V Permit Application Notice
Hampton Drying Company L-642
Kinder Morgan Bulk Terminals CO-898
Lifeport Inc. CO-895
Kalama Energy Center CO-899
U.S. Natural Resources / Woodland Division CO-900
Vancouver Toyota CL-1915
Keyera Bulk LPG Terminal CL-1921
Gardner, Denver, and Nash, LLC CL-1923

Application Number CO-844
Affected Facility

Chiltworth Pacific Fire Laboratories, Inc.
2401 B Talley Way
Kelso, WA 98626

Description of Facility
Chiltworth Pacific performs burning of materials in a laboratory test hood to gather information for modeling, litigation support, basic fire search and standards testing of materials.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions are less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for approval of the existing facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: NOX, CO, PM, VOC, SO2, HAPs, TAPs
Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

September 10, 2007
November 15, 2007

December 3, 2007

Agency Contact Person

Natalia Kreitzer
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 114
E-mail:

View PDF version of notice

Application Number CO-845
Affected Facility

Chinook Ventures, Inc. - Flat Storage
4029 Industrial Way
Longview, WA 98632

Description of Facility
Chinook Ventures is renovating the site of a former primary aluminum smelter (Reynolds) in Longview, Washington. Rehabilitation projects are focused on converting the site into a mixed use, industrial park.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for a proposal to reconfigure former production buildings (Buildings #51-#56) for use in storing and handling bulk commodities. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: PM, TAPs
Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

October 29, 2007
November 26, 2007

December 11, 2007

Agency Contact Person

Wess Safford
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 126
E-mail:

View PDF version of notice

Application Number CL-1815
Affected Facility

Pacific Rock Products, LLC
Portable #1 - Fisher Quarry
19201 SE 34th Street
Camas, WA 98607

Description of Facility
Portable rock crushing operation.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions are less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for installation of new rock crushers and aggregate screens at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: Particulate Matter (PM)
Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

December 10, 2007
January 16, 2008

January 31, 2008

Agency Contact Person

Wess Safford
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 126
E-mail:

View PDF version of notice

Application Number L-625
Affected Facility

Chehalis Lam, Inc.
195 Ribelin Rd.
Chehalis, WA 98532

Description of Facility
Chehalis Lam manufactures laminated wood structural beams
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions are less than 100 tons per year (tpy) of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for an increase in production limits at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of Particulate Matter and Volatile Organic Compounds
Public Comment Period A thirty (30) day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period on draft permit:

June 30, 2008
July 1, 2008

July 16, 2008

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 127
E-mail:

View PDF version of notice

Application Number CL-1901
Affected Facility

WaferTech
5509 NW Parker Street,
Camas, WA

Description of Facility
Semiconductor Manufacturing Facility
Source Designation

Title V Opt-Out
This facility is a stationary source that would be subject to the Operating Permit Program if a federally enforceable emission limit was not in place.  Facility emissions are limited to less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants. 

Purpose of Application
SWCAA has received a permit application for installation of an epitaxial reactor which will exhaust to an existing relocated scrubber and modification of existing emission testing and reporting requirements at the above described facility.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: VOC, HAPs, TAPs

Public Comment Period A 30 day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3).  When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA webpage under the "Permits and Appeals/Open for Public Comment" section (www.swcleanair.org/permitsprelim.html).  A notice announcing the draft permit will be published in a local newspaper.
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;

During the 30-day public comment period, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:

December 23, 2009
December 31, 2009

Agency Contact Person

Natalia Kreitzer
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 114
E-mail:

View PDF version of notice

Application Number CO-889
Affected Facility

United Harvest, LLC
400 Toteff Road
Kalama, WA 98625

Description of Facility Grain terminal
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
United Harvest has submitted a permit application requesting an increase in the permitted emission limits for the facility to accommodate increased business activity.  In addition, the application requests that the emission calculation methodology be updated.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: PM

Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

December 31, 2009
January 6, 2010

January 21, 2010

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 131
E-mail:

View PDF version of notice

Application Number CO-891
Affected Facility

Kalama Export
2211 N Hendrickson Rd.
Kalama, WA 98625

Description of Facility
Grain Export Facility
Source Designation

Title V Opt-Out
This facility is a stationary source that would be subject to the Operating Permit Program if a federally enforceable emission limit was not in place. Facility emissions are limited to less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for installation of new storage bins and associated conveyors and baghouses at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: Particulate Matter

Public Comment Period

A 30 day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3).  When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA webpage under the "Permits and Appeals/Open for Public Comment" section (www.swcleanair.org/permitsprelim.html).  A notice announcing the draft permit will be published in a local newspaper.

Opportunity for Public Involvement

Any person who wishes to review or comment on this application may:

  • Contact the agency contact person identified below for more information;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;

During the 30-day public comment period, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:

January 6, 2010
January 13, 2010

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 127
E-mail:

View PDF version of notice

Application Number CL-1908
Affected Facility

Old Friends Custom Finishing
3315 NE 112th Avenue
Vancouver, WA 98682

Description of Facility
Old Friends Custom Finishing operates a furniture stripping and refinishing facility.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions are less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for relocation of the facility from its former location at 7215-B NE 18th Street in Vancouver at the above described facility.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: NOx, CO, PM, VOC, SO2, HAPs, TAPs

Public Comment Period No public comment period for the draft permit is currently scheduled. A 30-day public comment period for the draft permit may be provided upon written request pursuant to SWCAA 400-107(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  •  Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below.

If a public comment period was requested and granted, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

March 1, 2010
March 4, 2010

March 19, 2010

Agency Contact Person

Natalia Kreitzer
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 114
E-mail:

View PDF version of notice

Application Number CL-1909
Affected Facility

Vantage Technology Inc.
1000 W 8th Street
Vancouver, WA 98660

Description of Facility
Methylsulfonylmethane (MSM) manufacturing facility
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions are less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application to approve a new Corother dust collector and an existing wet scrubber at the above described facility.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: PM, PM10, PM2.5

Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

March 8, 2010
March 11, 2010

March 26, 2010

Agency Contact Person

Vannessa McClelland
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 129
E-mail:

View PDF version of notice

Notice Prepared March 10, 2010
Applicant

The following applicant has submitted an Air Operating Permit (AOP) renewal application to the Southwest Clean Air Agency (SWCAA):

Hampton Lumber Mills – Randle Facility
PO Box 189
Randle, WA 98377

Action
SWCAA has received the Air Discharge Permit application March 10, 2010.
Facility Description

Hampton Lumber Mills has a sawmill located at 10166 US Hwy 12, Randle, Lewis County, Washington.  Hampton Lumber Mills is a manufacturer of finished lumber products.  The sawmill receives fresh cut Douglas fir and hemlock timber, and processes the wood into finished lumber.  The finished lumber is predominantly used for construction.  Dimensional lumber produced at Hampton Lumber Mills is shipped both kiln dried and green.  The green lumber is treated with anti-stain.  The sawmill equipment includes a Wellons hog fuel boiler and controls, dry kilns, pneumatic conveyors, plant vehicle traffic and debarking and saw equipment.

Pollutant Discharge
Estimated emissions of criteria and hazardous air pollutants (HAPs) to the ambient air for the year 2008 are as follows:
Pollutant

Actual Emissions (tons per year)

VOC
41.4 tpy
NOx
59.7 tpy
CO
83.0 tpy
PM
70.4 tpy
PM10
40.0 tpy
PM2.5
19.1 tpy
SO2
0.2 tpy
TAP
4.69 tpy
HAP
0.00 tpy
Project Impact This action does not change existing permit limits already established in federally enforceable Air Discharge Permits.
Agency Contact Person

Vannessa McClelland
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 129
E-mail:

View PDF version of notice

Application Number L-642
Affected Facility

Hampton Drying Company
PO Box 189
Randle, WA 98377

Description of Facility
Drying Facility
Source Designation

Title V Support Facility
The facility is a stationary source subject to the Operating Permit Program contained in Chapter 173-401 WAC.  Facility emissions are greater than 100 tpy of any single criteria pollutant, greater than 10 tpy of any single hazardous air pollutant, and/or greater than 25 tpy of any combination of hazardous air pollutants. 

Purpose of Application
SWCAA has received a permit application to modify dry kiln throughputs and emissions determinations at the above described facility.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: PM, PM10, PM2.5, VOC, HAPs, TAPs

Public Comment Period A 30 day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3).  When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA webpage under the "Permits and Appeals/Open for Public Comment" section (www.swcleanair.org/permitsprelim.html).  A notice announcing the draft permit will be published in a local newspaper.
Opportunity for Public Involvement

During the 30-day public comment period, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:

May 17, 2010
May 19, 2010

Agency Contact Person

Vannessa McClelland
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 129
E-mail:

View PDF version of notice

Application Number CO-898
Affected Facility

Kinder Morgan Bulk Terminals
Longview Bulk Terminal
Port of Longview; #10 Port Way
Longview, WA 98632

Description of Facility Marine cargo terminal
Source Designation

Minor
The facility will be a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for coal export operations without bulk storage at the above location.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action has the potential to impact emissions of the following pollutants: PM

Public Comment Period No public comment period for the draft permit is currently scheduled. A 30-day public comment period for the draft permit may be provided upon written request pursuant to SWCAA 400-107(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;

If a public comment period was requested and granted, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

June 2, 2010
June 8, 2010

June 23, 2010

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 131
E-mail:

View PDF version of notice

Application Number CO-895
Affected Facility

Lifeport Inc.
1610 Heritage Street
Woodland, WA 98674

Description of Facility
Lifeport Inc manufacturers interior parts for medical vehicles.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions are less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for approval of operations at the above described facility.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: NOx, CO, PM, VOC, SO2, HAPs, TAPs

Public Comment Period No public comment period for the draft permit is currently scheduled. A 30-day public comment period for the draft permit may be provided upon written request pursuant to SWCAA 400-107(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  •  Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below.

If a public comment period was requested and granted, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

May 13, 2010
June 15, 2010

June 30, 2010

Agency Contact Person

Natalia Kreitzer
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 114
E-mail:

View PDF version of notice

Application Number CO-899
Affected Facility

Kalama Energy Center
Port of Kalama
Kalama, WA

Description of Facility Natural gas fired combined cycle combustion turbine power plant
Source Designation

Minor (for purposes of New Source Review)
The facility will be a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for a new natural gas fired combined cycle combustion turbine power plant utilizing a single combustion turbine.  The plant is expected to produce approximately 346 MW of electrical power at average ambient conditions.  Maximum net output will be less than 350 MW.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action has the potential to impact emissions of the following pollutants: CO, NOX, VOC, PM, SOX, HAPs, TAPs

Public Comment Period A 30 day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3).  When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA webpage under the "Permits and Appeals/Open for Public Comment" section (www.swcleanair.org/permitsprelim.html).  A notice announcing the draft permit will be published in a local newspaper.
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information.
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below.

During the 30-day public comment period, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

June 22, 2010
June 29, 2010

July 14, 2010

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 131
E-mail:

View PDF version of notice

Application Number CO-900
Affected Facility

U. S. Natural Resources / Woodland Division
1981 Schurman Way
Woodland, WA 98674

Description of Facility United States Natural Resources (UNSR) repairs, reconfigures and manufactures saw mill log shaping and cutting equipment.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions are less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application to install and operate a plasma burn table vented to a cartridge-style fabric filtration system.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action has the potential to impact emissions of the following pollutants: NOX, PM, HAPs, TAPs

Public Comment Period No public comment period for the draft permit is currently scheduled. A 30-day public comment period for the draft permit may be provided upon written request pursuant to SWCAA 400-107(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;

If a public comment period was requested and granted, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

July 13, 2010
July 27, 2010

August 11, 2010

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 131
E-mail:

View PDF version of notice

Application Number CL-1915
Affected Facility

Vancouver Toyota
10455 NE 53rd Street
Vancouver, WA 98662

Description of Facility
Natural gas and used oil heaters
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application to approve a natural gas and two used oil heaters at the above described facility.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: NOx, CO, SO2, PM, PM10, PM2.5, VOC, HAPS, TAPs

Public Comment Period No public comment period for the draft permit is currently scheduled. A 30-day public comment period for the draft permit may be provided upon written request pursuant to SWCAA 400-107(3).
Opportunity for Public Involvement

If a public comment period was requested and granted, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:

April 15, 2010
August 10, 2010

Agency Contact Person

Vannessa McClelland
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 129
E-mail:

View PDF version of notice

Application Number CL-1921
Affected Facility

Keyera Bulk LPG Terminal
5501 NW Lower River Rd.
Vancouver, WA 98660

Description of Facility
This facility is a bulk handling facility for liquefied petroleum gas (LPG).
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions will be less than 100 tons per year (tpy) of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for approval to construct and operate an LPG bulk terminal at the above described location. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: Volatile Organic Compounds

Public Comment Period

No public comment period for the draft permit is currently scheduled. A 30-day public comment period for the draft permit may be provided upon written request pursuant to SWCAA 400-107(3).

Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;

If a public comment period was requested and granted, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period for draft permit:

June 14, 2010
August 12, 2010

August 27, 2010

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 127
E-mail:

View PDF version of notice

Application Number CL-1923
Affected Facility

Gardner, Denver, and Nash, LLC
2801 SE Columbia Way
Vancouver, WA 98661

Description of Facility
This facility manufactures and repairs air and gas pumps and compressors.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions will be/are less than 100 tons per year (tpy) of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for approval to operate an air and pump manufacture and repair facility at the above address. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: Nitrogen Oxides, Carbon Monoxide, Particulate Matter, Volatile Organic Compounds, and Toxic/Hazardous Air Pollutants

Public Comment Period

No public comment period for the draft permit is currently scheduled. A 30-day public comment period for the draft permit may be provided upon written request pursuant to SWCAA 400-107(3).

Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;

If a public comment period was requested and granted, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period for draft permit:

July 6, 2010
August 12, 2010

August 27, 2010

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 127
E-mail:

View PDF version of notice

 

If you wish to be informed on a current permit application, multiple permit applications and/or all activities of a source, you may sign up and become an interested party. As an interested party, we will keep you informed via e-mail or postal mail services (as indicated by you) on all activities you chose to be informed on. Click here to sign up to become an interested party.